EC 9715 Licensed · Main service for SE Perth

Switchboard upgrades — Canning Vale and SE Perth

The single most common job I do. Most Canning Vale, Thornlie and Willetton homes are 25–30 years old with boards that weren't spec'd for today's loads.

Send a clear photo of the board with the door open for an accurate quote.

SMS photo

What AJ sees on switchboard jobs

The single most-requested upgrade I do across the fleet is a switchboard changeover — the original 1960s-90s board, often asbestos-backed, with ceramic rewireable fuses and no RCDs, replaced with a current-spec board: MCBs on every circuit, RCDs covering power and lighting, properly-rated main switch, certified to AS/NZS 3000:2018. AJ's done hundreds across the metro — the workflow is reliable: power-off coordination with Western Power, careful asbestos handling if the existing board's backed with it, full board build to the customer's circuit count plus headroom for future load, certification and sticker, written sign-off. Most jobs are a single day on-site. EC 9715 licensed, $10M PL, fixed written quote before any work starts — no surprise add-ons. Photo of your existing board: 0415 966 469.

Original boards were spec'd for a fridge, an oven, and a window-rattler aircon. Now they're running ducted reverse-cycle, induction cooktop, pool pump, EV charger, and sometimes a granny-flat fridge too.

The fix isn't a bigger fuse — it's a properly designed upgrade with the right RCDs and load balancing.

What's pushing your board to the limit

Ducted reverse-cycle air conditioning
Induction cooktops
Electric vehicle charger
Pool pump and heating
Granny flat sub-board
Solar inverter and battery
Hot water heat pump
Home workshop/tools

What a proper capacity upgrade includes

Load audit
What you've actually got pulling current — not guesswork.
RCD grouping
The right number of RCDs grouped correctly so one trip doesn't black out the whole house.
Load balancing
Distributing circuits across phases if you go three-phase — or maximising what your single-phase can handle.
Futureproofing
Space and capacity for the EV, the battery, or the granny flat you haven't ordered yet.

When your board is fine — and when it needs work

Probably fine

  • • Modern board with spare circuits
  • • Two or more RCDs already installed
  • • No nuisance tripping
  • • Not adding major new loads

Time to upgrade

  • • Single old RCD or none at all
  • • Trips when dryer + AC run together
  • • Adding EV, granny flat, or pool
  • • Board is full or patched
Get a switchboard quote
Send a photo of your board for an accurate estimate.

Areas I cover

Canning ValeThornlieWillettonSouthern RiverHarrisdalePiara Waters
View all areas
EC 9715 · WA Licensed
Andrew's Home Services Pty Ltd
$10M Public Liability
Written quotes in advance

Ready to sort your switchboard?

Send a photo of your board and I'll tell you what you're actually dealing with — no obligation, no surprise invoice.